About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
Is there any way to copy a schedule scheme? I want to take a schedule that looks only at objects on the first story and make another one that looks at objects on the second story, but I can't figure out how to do it without rebuilding the entire scheme.