cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
2024 Technology Preview Program

2024 Technology Preview Program:
Master powerful new features and shape the latest BIM-enabled innovations

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

DOOR SCHED R.O. HEIGHT

Anonymous
Not applicable
WE CAN NOT FIGURE OUT HOW TO GET THE DOOR SCHED TO READ A VERTICAL ROUGH OPENING FOR DOORS. THIS OUGHT TO INCLUDE DOOR HEIGHT + TOP FRAME THICKNESS + THRESHOLD THICKNESS + SHIM SPACE. WE WOULD ALSO LIKE TO BE ABLE TO SET THE BOTTOM AT 3/4" BELOW FIN FLOOR. WE CAN NOT FIND A WAY TO GRAB THESE PARAMETERS FROM THE DOOR OBJECT IN THE SCHEDULE SCHEME SETTINGS.
0 REPLIES 0