Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

DS Door & window schedule elevations

Anonymous
Not applicable
I'm dragging and dropping the DS door schedule elevations into a layout from
the project map and it comes in empty and when I double click the schedule is empty as well ( not populating ). The door and window schedules are working
fine, just can't get the door and window "type" elevations to work.
I'm using AC 18 on vista ultimate machine.
0 REPLIES 0