2024 Technology Preview Program:
Master powerful new features and shape the latest BIM-enabled innovations
2016-05-12 08:12 PM
2016-05-13 04:23 AM
2016-05-27 05:43 AM
Klodi wrote:You can probably manage that with layers, layer combo, and schedule Criteria.
I'm working on a project with a split level between cellar and 1st Floor (7' from cellar and 3'-4" from 1st Floor). Doors that are on this Split level are shown on 1st Floor door schedule but I want them in cellar door schedule. All walls and doors home story is cellar level. PLEASE HELP. THANKS
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2016-06-02 01:35 PM