About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
Any easy way to bring schedules into a template from a working PLN? I have created several on a project that I would like to include in the template but can't find a way to do it.
Have tried through Organizer but that did not work; copy and paste was a no go also.
In your schedule scheme settings you can 'Export' from one job into a folder on your system.
Then in the other job you can 'Import' them in.
Barry.
One of the forum moderators. Versions 6.5 to 27 i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10 Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11