Does anyone have a clue of what's going on with those schedules? I'm trying to get a schedule that shows me the finishings of a certain zone (for a interior design project). If I select all slabs from the layer the floor finishes are built within all the project I get the list, but if I restringe the search in a zone it shows me nothing! But the schedule does work fine with objects in the same zone, so I don't get it! I guess the pictures explain me better:
Patricia Leão
AC21 INT Full
MacOSHighSierra