About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
Interactive schedules: display stories in ascending/descendi
In the interactive schedules, I need to display the stories in ascending/descending order. However since the names are not in ascending/descending order (P1 is followed by Ground followed by 2nd floor, etc..)
I need it to use the built in storey number not the storey name.
I’m not sure what you mean by that, but I will paraphrase nevertheless:
How do you get the interactive schedules to use the built in storey number and not the storey name?
I think you mean a Schedule Field (sorry for the minsunderstand) -- you may need to customize your Zone (or listed element) and add this parameter, or input the Story ID into one of the Custom Text fields.
MacBook Pro Apple M2 Max, 96 GB of RAM AC27 US (5003) on Mac OS Ventura 13.6.2 Started on AC4.0 in 91/92/93; full-time user since AC8.1 in 2004