Greetings, I am using the Total Zone where the Area per Person field is used to automatically calculate the total occupants based on measured area. I desire to have that field displayed in the schedule as well but when I attempt to add that field it does not appear in the drop down list. Is there a way to add that field to the drop down list? Thanks, Scott
AC27 v. 4060 w/ MEP, Cadimage, Twinmotion 2023.2.2 using AC from AC6.0, 2021 MacPro M1 chip, Adobe CC. Used AC on both platforms.