About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
Can anyone explain why scheduling is so slow.
It's tedious and painfully slow.
I've only a schedule of maybe 40-50 items.
It's just a excel speed sheet after all!
What are you scheduling?
Can you show us an image of the settings (criteria & fields).
Barry.
One of the forum moderators. Versions 6.5 to 27 i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10 Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11