Advocate
I absolutely LOVE the feature (since 19, maybe?) where you can have the schedule fold over to multiple columns... so if my schedule is 5 cells wide x 100 cells long, I can fold it to 2 sets of 5 cells wide x 50 long (each)...

But, I have noticed that some setting will force this to REVERT back to original 5 x 100 after re-opening the file... (it may happen without the re open, but that's when I notice it the most)...

Is it because I have the FIT FRAME TO DRAWING checked?

It's frustrating because PUBLISHING means I've got to go and verify ALL my schedules to see if they've reverted...

Anyone?
Duane

Visual Frontiers

AC25 :|: AC26 :|: AC27
:|: Enscape3.4:|:TwinMotion

DellXPS 4.7ghz i7:|: 8gb GPU 1070ti / Alienware M18 Laptop
1 REPLY 1
Anonymous
Not applicable
I remember we had the same issue and we have even reported it as a bug. Glad to hear we are not the only one.