Scheduling/Listing with Renovation Filters

Rick Thompson
Expert
I have not really needed to mess with the Renovation Filters until now. I wanted to run a material list for only the new construction, but I can not see anyway to set up the list schemes and use the Renovation Filters to select only the "New" construction. This can't be, but???? The only work around I can see is to copy the file, delete all the "old" construction, then run the list... really???

The Interactive Schedule is no help as you can't link to the data base and pull studs and other quantities.

I hope I am missing something?
Rick Thompson
Mac Sonoma AC 26
http://www.thompsonplans.com
Mac M2 studio w/ display
6 REPLIES 6
Laszlo Nagy
Community Admin
Community Admin
I might misunderstand, but:

In the Schem Settings Dialog, in the Criteria panel you can sel the following Criterion:
"Renovation Status" "is" "New"
and that should list only those elements, no? Works for me.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28
Rick Thompson
Expert
Would you post a screen shot of what you see please. I'll bet I don't have the newest list scheme dialog loaded. That would explain it. I was assuming the actual "List scheme" is part of the app, but maybe it is loaded with "List Templets" folder? I'll attach a screen shot of what I see and is loaded.

thanks
Rick Thompson
Mac Sonoma AC 26
http://www.thompsonplans.com
Mac M2 studio w/ display
Rick Thompson
Expert
Maybe I am not following what you are referring to. In the Find dialogue you can select Renovation "is" and "new", but not under "Link to Criteria" under Link Properties to Criteria. And, it that were the case that would mean setting up duplicate Property Objects for the various options, so that would not make sense. I guess I don't see where you are finding it?.
Rick Thompson
Mac Sonoma AC 26
http://www.thompsonplans.com
Mac M2 studio w/ display
Laszlo Nagy
Community Admin
Community Admin
Sorry, I thought you are talking about Interactive Schedule. I did not pick up that you try to do this in old Listing.
I don't think any new feature has been added to the old listing for the last several versions besides adding the new element types in new versions to the listable elements.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy
AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD
2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28
Rick Thompson
Expert
Thanks... unfortunately it is still the only way to calculate many things (via Property Objects). One day maybe the IS will be able to do these things... studs, plates etc.
Rick Thompson
Mac Sonoma AC 26
http://www.thompsonplans.com
Mac M2 studio w/ display
Laszlo Nagy
Community Admin
Community Admin
I agree, it would be great if Interactive Schedule also knew all the things the old listing can do.