cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
2024 Technology Preview Program

2024 Technology Preview Program:
Master powerful new features and shape the latest BIM-enabled innovations

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Scheduling the volume of wall "demolished" by a New Window

Ruben V
Advocate
When I insert an "New" window into an "Existing" wall (using Renovation Tool), the whole created in the wall, is nicely displayed in a view of the demolished elements (e.g. in a red color).

Strangely enough the volume of the wall, that has to be "removed" to be able insert the room in real life, doesn't come up in the Schedule.

I Schedule walls, Renovation Status = To Be Demolished, the window is large enough, so any calculation rules for conditional volume don't apply...

is this a limitation of Renovation Tool?
(òÓ,)_\,,/
www.studiov2.be
Archicad 26/27 + Rhino/Grasshopper
BIMcollab ZOOM
>>> Read my book!<<<
0 REPLIES 0