License Delivery maintenance is expected to occur on Saturday, November 30, between 8 AM and 11 AM CET. This may cause a short 3-hours outage in which license-related tasks: license key upload, download, update, SSA validation, access to the license pool and Graphisoft ID authentication may not function properly. We apologize for any inconvenience.
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

WINDOW ORDER IN THE SCHEDULE

Anonymous
Not applicable
I LABEL MY WINDOWS A1,B1,C1,D1, ETC FOR MAIN LEVEL WINDOWS AND A2,B2,C2, ETC FOR UPPER LEVEL WINDOWS BUT IN MY SCHEDULE IT LISTS THEM IN ORDER LIKE THIS - A1,A2,B1,B2,C1,C2 ETC. I WANT THE FIRST FLOOR WINDOWS TO LIST FIRST IN THE SCHEDULE AND THE SECOND LEVEL WINDOWS TO COME AFTER IN THE SCHEDULE.

i CANT FIGURE OUT WHAT I AM DOING WRONG.
ANY HELP WOULD BE APPRECIATED.
1 REPLY 1
Karl Ottenstein
Moderator
cougarbrent wrote:
I LABEL MY WINDOWS A1,B1,C1,D1, ETC FOR MAIN LEVEL WINDOWS AND A2,B2,C2, ETC FOR UPPER LEVEL WINDOWS BUT IN MY SCHEDULE IT LISTS THEM IN ORDER LIKE THIS - A1,A2,B1,B2,C1,C2 ETC. I WANT THE FIRST FLOOR WINDOWS TO LIST FIRST IN THE SCHEDULE AND THE SECOND LEVEL WINDOWS TO COME AFTER IN THE SCHEDULE.

i CANT FIGURE OUT WHAT I AM DOING WRONG.
ANY HELP WOULD BE APPRECIATED.
For fields for which you have enabled sorting (up or down arrow), they are sorted in order, top to bottom (field list) - left to right (schedule itself). So, if you want things grouped by story, you must add the story to your field list and make it the first field. Make it a 'title' field so that it displays only once for each story. (I don't have AC running at the moment. AC may call this a 'headline' field or something like that.)

Cheers,
Karl
One of the forum moderators
AC 28 USA and earlier   •   macOS Sonoma 14.7.1, MacBook Pro M2 Max 12CPU/30GPU cores, 32GB