About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.
I have all of our schedules set up, but I was just presented with a problem that I can't quite figure out. We have one wall that is 40 feet tall and holds three stories. There are windows in each. In my schedule it is reading the header height from the bottom of the wall and I can't find the parameter that tells it to read the header height from anchor point of the window (header height from story 2). The windows on the second story are reading as 20'-6" in my header height column instead of 8'-0". Am I missing something?