2010-12-03 07:36 PM
2010-12-04 02:32 PM
2010-12-05 01:46 AM
David wrote:David ........
Michael:
Those look like parameters that are used with the MEP add-on, so you may not be able to use them if you don't have the add-on, or are using a dongle that does not have a MEP license. It is also possible that the objects are locked or on a locked layer, but the Interactive Schedule would let you know (warning at the top of the schedule dialog box).
David
2010-12-05 02:42 PM
Michael wrote:The "Plumbing Fitting Schedule" does not have the MEP parameters, the "Plumbing Fixture Schedule(s)" do, so better naming would help. My guess is that most users are going to modify these sorts of schedules anyway.
....Perhaps GS should withdraw this from the standard pull downs so as not to confuse the un-expecting users ?