Usually i have to deal with iregullar column shapes. I then use walls with different fill.
Till here all normal.
Lets make 2 walls perpendicular. One normal and one with concrete fill used as a column. I make both walls 1m long and 20cm thick and 3m height
Now go to the IS (interactive schedule maker)
Make a wall list. The external surface on the reference (external) line = 1x3=3 square meters. BOTH. The 20cm overlap is not substracted by neither.
I next change the layer of the column wall to a layer with a layer priority number ( i hope its called that way) 2. Now the column wall is on top of the normal wall but in the IS i still get 3 s.m for both.
In the preferences i can set the priority for walls and columns and beams
but for 2 walls i cannot do that.
All computations are wrong. The volume of the 2 walls is wrong. The surface ...
Does anyone know a solution to that problem? or am i somewhere wrong?