Doors
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-02-04
06:54 PM
- last edited on
‎2023-05-26
11:14 AM
by
Rubia Torres
‎2016-02-04
06:54 PM
4 REPLIES 4

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-02-04 07:53 PM
‎2016-02-04
07:53 PM
Is this what you're looking for: Video?
Architectural construction designer, draftsman, modeller
ArchiCAD 25.
ArchiCAD 25.
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-02-04 08:29 PM
‎2016-02-04
08:29 PM
I get this every time I do it. The only way I have found to do it is is I lower the foundation 1/4" and then run the carpet. But that leaves a gap between the wall and the floor

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-02-04 08:39 PM
‎2016-02-04
08:39 PM
Do you change the top of the floor into carpet or do you draw in the carpet separately?
Architectural construction designer, draftsman, modeller
ArchiCAD 25.
ArchiCAD 25.
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-02-04 08:43 PM
‎2016-02-04
08:43 PM
Dontknow wrote:Draw it per room. Like the last Office I did the hallways were tile and the rooms were carpet
Do you change the top of the floor into carpet or do you draw in the carpet separately?