2008-06-27 11:51 AM
2008-06-27 06:37 PM
2008-06-27 07:27 PM
David wrote:
Can you fill the rest of us in?
2008-06-27 09:16 PM
2008-06-30 06:26 AM
2008-07-07 07:40 AM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2008-07-07 03:43 PM
2008-07-07 06:22 PM
ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25
2008-07-10 10:26 PM
Steve wrote:There is a whole lot more to BIM/VB than just schedules. Planning, design coordination, constructibility, construction coordination, 4D, 5D, forensics, disaster management pop to mind. There is yet much more (like facilities management etc.)
I think the the measure of BIM software aught to be it's schedules
2008-07-29 02:06 PM
Miki wrote:OK, now I am back from celebrations and a long vacation..
BIM - Building Information Modeling. You don't have to extract the information. But it has to be integral part of the model. If you CAN extract it then it is BIM.