2011-06-1703:58 AM - last edited on 2023-05-2506:28 PM by Rubia Torres
2011-06-1703:58 AM
If im working two different houses in the same project.. (its a teamwork project actualy).. but they have different levels.. I mean.. the slabs of the first house are at +-0.00, +3.00, +6.00.. but in the other house are at +1.5, +4.5, +7.50
im having trouble with wall representation because of the levels..