2017-10-0209:05 PM - last edited on 2023-05-2412:40 PM by Rubia Torres
2017-10-0209:05 PM
I am sure this has been asked before. I am working a simple foundation. I want to show part next story up so my foundation shows the walls with door openings but with a dashed line.
I start with the 1st floor plan view.
I go into the Floor Plan Cut Plane under Documenting Tools and enter in Relative
Floor Plan Range .
Show up to: Current story, offset by 5'.
Show down to: Current story, offset by -1'
and then Absolute Display Limit: Project Zero, -1'
...thinking this will allow me to show the walls and openings of the 1st story on the Foundation. It should work but I must be doing something wrong.
I always want to do this but I have just bypassed it to save time since it is already on another plan.
Does overlaying two separate plans in a layout do what you want?
Barry.
One of the forum moderators. Versions 6.5 to 27 i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10 Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11