I am very happy that i can join your community! At the beggining I have two questions!
Michal wrote:
1. I use an International student version of Archicad. I've spent on project over 25h of work. Now I would like to change material symbols (fills) in 2d view for European one. What is the fastest way to do so?
Michal wrote:
2. What methods do you use guys for managing the junction order? I still have a problem with brick wall interfering with roof (going trough ).
Michal wrote:
3. Bonus question: If my wall just ends. And I would like to have plaster on the side instead of visible all layers what should I do?
2020-05-20 02:52 AM
Michal wrote:
Hi All!
I am very happy that i can join your community! At the beggining I have two questions!
Michal wrote:
1. I use an International student version of Archicad. I've spent on project over 25h of work. Now I would like to change material symbols (fills) in 2d view for European one. What is the fastest way to do so?
Michal wrote:
2. What methods do you use guys for managing the junction order? I still have a problem with brick wall interfering with roof (going trough ).
Michal wrote:
3. Bonus question: If my wall just ends. And I would like to have plaster on the side instead of visible all layers what should I do?
2020-05-20 05:04 PM
2020-05-21 11:21 PM
2020-05-22 04:51 AM
Michal wrote:
Thank You Barry for suggestions. I will ask questions separetly next time.
In the first point what I meant is how to change the hatches. For example, in my model in 2d view when you look at cut elements, concrete block material has this checked pattern, but in Poland we use continouse line pattern tilled 45° next to each other and small circles in between. And I've tried introduce overide rules and make costum hatches but it overides the fill in whole member (different layers are no longer visible). I am flustrated as I try to figure out how to do this 3th day and I cant hand over my projects to the teacher like that.
Thank you!