one issue - historically anyway - has been that the trace reference is selected from the View Map as opposed to the Project Map. Trace references fro the PM take less time to process or refresh.
Think Like a Spec Writer
MacBook M4Pro
AC4.55 through 29 / AC29.0.1 USA
Rhino 8.25 Mac
MacOS Tahoe 26.1