Is there a way to do some calculation on the schedule? Say, the schedule has provided some information (area, volume) of materials, if I know a price of wood is $200/㎡, can I tell the schedule to use the area (450㎡) to multiply the price ( 450㎡x$200/㎡ ) to give me a total cost ($90,000)?
I know you can export the schedule to Excel to do all the calculation but I am interested in if we can do it within ArchiCAD?
Thank you in advanced.
Jack
5 REPLIES 5

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-10-26 05:25 AM
‎2016-10-26
05:25 AM
No.
There will be a wish or two in the wish section requesting this if you want to add your vote.
Here is one of them ...http://archicad-talk.graphisoft.com/viewtopic.php?t=33203
Barry.
There will be a wish or two in the wish section requesting this if you want to add your vote.
Here is one of them ...
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-10-27 12:17 PM
‎2016-10-27
12:17 PM
Hi Barry,
Thanks for your reply. Now I know I cannot do calculation on ArchiCAD schedule. But I am thinking is it possible to let ArchiCAD automatically export schedule to an excel format? Beacause I am trying the live connection between GH and ArchiCAD, I have succeeded to use a dynamic GH script to update a model in ArchiCAD, so now I would like to have ArchiCAD to do a real time export information for me to do some cost calculatuon in GH.
Thank you in advanced,
Jack
Thanks for your reply. Now I know I cannot do calculation on ArchiCAD schedule. But I am thinking is it possible to let ArchiCAD automatically export schedule to an excel format? Beacause I am trying the live connection between GH and ArchiCAD, I have succeeded to use a dynamic GH script to update a model in ArchiCAD, so now I would like to have ArchiCAD to do a real time export information for me to do some cost calculatuon in GH.
Thank you in advanced,
Jack

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-10-28 03:21 AM
‎2016-10-28
03:21 AM
You could create a Publisher set to publish them in Excel format.
Barry.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Anonymous
Not applicable
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-10-28 04:32 AM
‎2016-10-28
04:32 AM
But can it automatically publishes to Excel when the schedule updates? Instead of manually clicking buttons to publish?

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2016-10-28 05:00 AM
‎2016-10-28
05:00 AM
No you would have to manually publish.
Barry.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11