Is there a way to do some calculation on the schedule? Say, the schedule has provided some information (area, volume) of materials, if I know a price of wood is $200/㎡, can I tell the schedule to use the area (450㎡) to multiply the price ( 450㎡x$200/㎡ ) to give me a total cost ($90,000)?
I know you can export the schedule to Excel to do all the calculation but I am interested in if we can do it within ArchiCAD?
One of the forum moderators. Versions 6.5 to 27 i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10 Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Hi Barry,
Thanks for your reply. Now I know I cannot do calculation on ArchiCAD schedule. But I am thinking is it possible to let ArchiCAD automatically export schedule to an excel format? Beacause I am trying the live connection between GH and ArchiCAD, I have succeeded to use a dynamic GH script to update a model in ArchiCAD, so now I would like to have ArchiCAD to do a real time export information for me to do some cost calculatuon in GH.
Thank you in advanced,
Jack
You could create a Publisher set to publish them in Excel format.
Barry.