sussudiokim wrote:The program does not know why you are drawing a fill. It places it in a display order. You just have to bring the fill to the front of the display order.
For example, why is there an internal logic as to how objects are layered while drafting? I draw a fill, and it is automatically drawn below my slab, though I drew it to highlight an area above my slab.
2013-09-17 08:05 PM
sussudiokim wrote:I haven't ever used the curtain wall tool, but an "empty opening" is a type of opening, as is a curtain wall. So I don't believe there should two different types of openings in the same area. Maybe that is the explanation?
I draw a curtain wall to fit within the empty window opening in the wall. But yet, the curtain wall is drawn below the fill layer of that window opening.
2013-09-18 05:43 PM