Learn to manage BIM workflows and create professional Archicad templates with the BIM Manager Program.
2017-05-25
06:59 AM
- last edited on
2023-05-25
05:37 PM
by
Rubia Torres
2017-05-25 08:08 AM
2017-05-25 11:58 PM
2017-05-26 03:02 AM
Gazmon wrote:If you are happy with the surface levels on the mesh but just want to move it relative to the building model then that is what you do - just move the entire mesh.
Thanks. I'll probably just adjust the height of the mesh I'd say, which I had done previously.
Surely there has to be an easier way to move soil, terrain, etc. when you're doing a cut/fill on a site.