I am now coming to the belief that the goal is to draft a little as possible and keep true to a live model as much as possible. This way changes are updated to the live model. Redundant drafting of fill overlays is a waste of time and makes for one more thing to remember when a change is made elsewhere. How many other things that we draft can GS incorporate into the model functionality gracefully?
Claire Remsberg
Remsberg Architecture, P.A.
MacBook Pro, OSX 12.6, ArchiCAD v25 (5010)