Hi all,
Is there a way to show the Transmittal Set Date on all included Layouts even if a Change has not been added to them?
eg.
Issue "Drawing A rev 01" to the engineer on the 1st, I create and close a Transmittal and it shows on my Layout as "01 Issue to Engineer 01/xx/xx"
Issue "Drawing A rev 01" to the interior on the 2nd, I create and close a new Transmittal and have it now show on my layout the previous as well as "01 Issue to Interior 02/xx/xx"
Ling.
Operating system used: Mac Intel-based