I'm trying to change layer combinations in AC13 teamwork. I can reserve layers by clicking on the reserve button below, and I understand that reserves all the layers, but the Update button under layer combinations is grayed out no matter what I do.
I am, too, having this issue as well as not understanding how to reserve a layer combination.
I have changed all our draftsman's abilities to change everything in the model, and I signed in as Lead Architect myself and I Still do not see how to update a layer combination.
If you've changed your settings, you should be able to just click the "reserve" button in the layer settings. Then you can update/change layer combinations.
Aside from being "Lead Architect" I am also "Project Administrator". Maybe this is what's hanging you up, try changing your settings to that as well.
And don't forget if you change someone's settings you need to have them leave the project completely and then log back in before anything takes effect.
So to summarize, in general, the Reserve button reserves the Dialog so you can make modifications (if you do not have the right you will not be able to even reserve it).
You can create new Layers and Layer Combinations but to modify existing ones you will definitely have to reserve the Dialog.
Loving Archicad since 1995 - Find Archicad Tips at x.com/laszlonagy AMD Ryzen9 5900X CPU, 64 GB RAM 3600 MHz, Nvidia GTX 1060 6GB, 500 GB NVMe SSD 2x28" (2560x1440), Windows 10 PRO ENG, Ac20-Ac28