cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
Sedak
Contributor
since ‎2023-09-11
Monday

User Statistics

  • 6 Posts
  • 0 Solutions
  • 7 Likes given
  • 10 Likes received

User activity

It would be great if we could use certain parts of a schedule as schedule-based properties (for example in applications such as Project Info or Properties). What I am proposing is to give us an option to have a schedule-based property of a total of a...
There is a lot of times that I wish that we had dynamic elements of a module. Like how we have Modifiers on Custom Profiles. There is an option to do that now with Design Options inside the module, but it is not flexible enough in my opinion. We alre...
We should have the possibility to use and set certain properties for hotlinks as a whole, similar to how there are properties for building materials specifically. We have master ID - we should also have master properties. For example: I am using the ...