Scheduling Slabs

Aaron Bourgoin
Advisor
Are slabs (used as building masses in a Master Planning Study) able to be read by a Zone? It doesn't seem to be working and I'm baffled as to why a Zone can't itemize slabs contained entirely within them.
Think Like a Spec Writer

AC4.55 through 26 / USA AC25-5010 USA

Rhino 7 Mac

MacOS 11.6.5
1 ACCEPTED SOLUTION
5 REPLIES 5

Podolsky
Ace
Yes, this is known problem - slabs are not seen by zones. I had such a problem - I needed to model floor and ceiling and make schedule of them in relation to rooms (i.e. this room - this floor type and area, another room - another floor type etc.). So I was not able to do it!
The only solution I have found - use roof with 0 inclination instead of slab.
I can imagine this happens because originally ArchiCAD was designed the way that you need to extract floor type and area from zone tool. But that was ages ago - when 3D models was not so detailed (and couldn't be).

Aaron Bourgoin
Advisor
Thanks Podolsky. Hey GS. Please change this. Placing roofs is more cumbersome than placing slabs. Especially when you're using slabs as something other than a slab.

Morphs perhaps?
Think Like a Spec Writer

AC4.55 through 26 / USA AC25-5010 USA

Rhino 7 Mac

MacOS 11.6.5

Podolsky
Ace
I don't think morphs are the solution. For example you need to place a floor that is composite - floor finish, underfloor hearing electrical matt, some resilient layer... Morph cannot manage this - because it cannot give you area in plan and thickness of the layer. It can give you only volume...

In general I think that is would be a great idea to have floor tool - separated from slab. As it happens in Revit.

Solution
Barry Kelly
Moderator
Aaron wrote:
Are slabs (used as building masses in a Master Planning Study) able to be read by a Zone? It doesn't seem to be working and I'm baffled as to why a Zone can't itemize slabs contained entirely within them.
I don't think the slab knew which zone it was in before, but they do now in 24.

https://archicad-talk.graphisoft.com/viewtopic.php?f=34&t=26946&p=322174&hilit=zone+slab+schedule#p3...

Barry.

One of the forum moderators.
Versions 6.5 to 25
Dell XPS- i7-6700 @ 3.4Ghz, 16GB ram, GeForce GTX 960 (2GB), Windows 10
Dell Precision 3510 - i7 6820HQ @ 2.70GHz, 16GB RAM, AMD FirePro W5130M, Windows 10

Aaron Bourgoin
Advisor
Thanks Barry, will recommend migrating the project in question from v22 to v24. straightaway.
Think Like a Spec Writer

AC4.55 through 26 / USA AC25-5010 USA

Rhino 7 Mac

MacOS 11.6.5

Start a new conversation!

Still looking?

Browse more topics

Back to forum

See latest solutions

Accepted solutions

Start a new discussion!