We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Computed Fields in Schedules

Anonymous
Not applicable
Hi,

how can I add computed fields to schedules in ArchiCAD?

In Revit I can add custom fields with calculated values. Is there a similar functionality in ArchiCAD?

Thanks, J.
1 REPLY 1
Eduardo Rolon
Moderator
You can't. This is one thing were Rvt is better than AC. You can sum all the items in a column but that's about it.
The workaround is to export to Excel, creare a PDF from the sheet and import the PDF in AC.
Eduardo Rolón AIA NCARB
AC27 US/INT -> AC08

Macbook Pro M1 Max 64GB ram, OS X 10.XX latest
another Moderator