Getting things to NOT schedule?

Ivan Myers
Booster
I need some columns to not schedule. I have listed the "Full ID" as OMIT and told the scheduler to NOT list ID's with the word OMIT, I've even tried changing its "Element Classification" to something other than a Column.
They still end up on the Column schedule.

What is the trick?

Thanks
Ivan
Designer/ Drafter

ArchiCAD 26 on 27" Mac
2 REPLIES 2
Barry Kelly
Moderator
Can you show a screen shot of your schedule criteria?
It may be easier to work out what the problem is.

Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Ivan Myers
Booster
Hi sorry for the late reply. I think I got it solved a while ago by learning a bit more of how the scheduler works and how the parameters work. Thanks though.