While running a door schedule, the schedule picked up the doors from a 3rd story but not the zones. Of note, the 4th story was 2'-5" above the 3rd. When the 4th story was eliminated, the zones were picked up by the schedule. Is there a way to remedy this and not eliminate the 4th story?