Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Notes in Schedule

Llian
Advocate
I added a Custom Text as to a schedule and change the title to Note but it doesn't allow me to write anything on it....am I missing something here?

Screen shot 2016-06-17 at 9.53.34 PM.png
Lilian Seow
LEED AP | cSBA | CAPM | PMP
Interior-Architecture and BIM Management
AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!
1 REPLY 1
Anonymous
Not applicable
Llian wrote:
...am I missing something here?
Possibly. Teamwork management structure?

You might have reserved Teamwork editing rights to the Schedule itself, but (as ARCHICAD User Guide explains in detail) Schedule is a live, two-directional connection to any project element and since you had not reserved the right to edit that specific element — you can't enter notes.

Basically, if you want to add notes to a custom field you've created in any Teamwork Schedule you would have to reserve items you are editing, not the schedule, i.e. in your case — individual sanitary equipment objects.