I just realised that a wall cut by a Solid Element Operation (roof) does not give the reduced quantities when calculated in the list scheme.
The full surface area of the wall is listed as if it has never been cut.
This is the same for all SEOs on all elements.
The curious thing is that if the same calculation is done in a schedule the the correct value is given (i.e. the full surface area less the SEO cut).
Why the inconsistency?
Personally I like to use the list schemes as I can controll the figures and perform calculations when obtaining the quantities.
The schedules are OK but limited in what information you can get and you can't perform any internal calculations.
Now I have realised I can't trust the calculations if I have any SEOs.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11