cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
Showing results for 
Search instead for 
Did you mean: 
Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

!Restored: Pocket Doors in a schedule

How do I get the pocked doors not to show up as as right or left hand in a schedule?
I would like to show that there are 4 of the same, not 3 lefts and 1 right when they are exactly the same door.

ArchiCAD 25 7000 USA - Windows 10 Pro 64x - Dell 7720 64 GB 2400MHz ECC - Xeon E3 1535M v6 4.20GHz - (2) 1TB M.2 PCIe Class 50 SSD's - 17.3" UHD IPS (3840x2160) - Nvidia Quadro P5000 16GB GDDR5 - Maxwell Studio/Render 5.2.1.49- Multilight 2 - Adobe Acrobat Pro - ArchiCAD 6 -25

11 REPLIES 11
Anonymous
Not applicable
Beir - unfortunately you are not missing something. the new 12 pocket doors just do not display properly in 2D. see http://archicad-talk.graphisoft.com/viewtopic.php?t=24124&highlight=pocket+door

since we just had a hotfix released, hopefully a library update will be forthcoming to fix this soon
Anonymous
Not applicable
Thanks Scott for the info and link.
I missed that.
Bier