"From a conceptual and philosophical perspective, BIM is a better way to design, construct, and manage buildings. It allows architects to design more efficiently, construction firms to better manage costs, and owners to stay on budget and control day-to-day operational costs. BIM fulfills the promise
of economic gain and also better business relations. Excessive change orders, resulting from communication errors or missing information, negatively reflect on owner’s perception of architects and construction firms. Architects and construction firms with a reputation for costly overruns tend to lose business.
"As the key technology shared between architects and construction firms, CAD applications have taken center stage in the movement to take BIM mainstream. CAD’s ability to capture and represent the geographic information, building geometry, component relationships, and quantities and
properties of building components is at the heart of BIM. Several CAD vendors tout their applications as central to the BIM process, capable of managing the complex 3D information model generated on a BIM project. But are they really? As BIM evolved, architectural intelligence was built on top of primitive foundations. Many BIM applications have limited functionality and key elements of the model cannot be represented in 3D; most do not have a modeling kernel reliable or fast enough to handle large, detailed 3D models. Without the efficiency of a purpose-built 3D modeling kernel, good visualization becomes an extremely time-consuming process.
"We have the answer to BIM’s technological problems: adopt the time-tested platform used by the MCAD industry to build the best architectural 3D CAD solution available. With a purpose-built 3D modeling kernel, Vectorworks 2009 manages building complexity which previously tested the limits of
most BIM applications."
But then, Boingo:
At the Nemetschek Press Event, Ralph Grabowski reports this about Jim Flaherty's keynote theme which is
"BIM Isn't Happening...
...because it costs architects to implement BIM [building information modeling], but they do not get paid more for using it. (In the row ahead of me, Ed Goldberg was vigorously nodding his head in agreement.) Architects want a payback for themselves; they care not if the owner saves money down the road with BIM, because architects don't get any of that savings paid back.
"The key strength of Vectorworks is its free-form modeling, which products like Revit can't do. Mr Flaherty is pleased that Autodesk helps out Vectorworks by marketing BIM and Revit -- but then ends up selling AutoCAD.
"For five years, the #1 selling point of Vectorworks has been its presentation graphics -- outputting good looking drawings with gradients, transparency, 2D Booleans, and non-photorealistic effects in 2D and 3D. All this generated within Vectorworks, again something competitors can't do.
"Now there is a new key mission: Design. Mr Flaherty segregates design into four steps:
I. 2D.
II. 3D Conceptualization or Visualization.
III. Integrated Design and Development.
IV. Model-centric BIM [building information modeling].
Most customers are at step II, 3D Conceptualization; he's trying to get users to the next step, Integrated Design.
Step IV? It's a long way off. Model-centric BIM is the future that everyone talks about today. But there are lots of holes in the process, such as legal issues. Today, BIM works only for owner-builder-operators, such as GM building its own plants.
So, what are some of the limitations of competitors -- Revit, in particular?
* Modeling limitation; freeform modeling is needed to design things like spline-shaped roof edges. Vectorworks is the only one with NURBS surfaces.
* 3D speed and robustness; purely parametric modelers can't handle the model size once details are added.
* Complex UI; users face varying user interfaces when they switch between 2D and 3D packages from the same vendor. Vectorworks has the same UI for all its software.
* BIM slows down design; users spend too much time wrestling with the system.
* Good visualization is hard to get; customers find they have a hard time reproducing the beautiful renderings pictured on the vendor's Web site.
Mr Flaherty sees BIM as something that excites accountants, but not architects, and thinks that paper drawings will be the preferred output method for his lifetime -- as opposed to exchanging drawings electronically."
see the whole article at Issue #572 : : Setpember 16, 2008
http://www.upfrontezine.com/2008/upf-572.htm
Seems Mr. Flaherty has a different idea of what BIM is. His approach seems to be to say, everyone else's ideas about BIM are wrong or wrong headed. And then to take BIM back to CAD circa 1993.
2008-09-26 06:22 PM
2008-09-26 06:34 PM
metanoia wrote:Thanks for illustrating the practical side! I didn't know the specific shortcoming of VW and why it is not considered BIM. More importantly from a practical side, having to redraw elevations is a major drawback.
Mr G
Rebuilding a section or elevation in VW is still a laborious process (less so with each release, granted), but the fact that me and a colleague can be working togetherin the very same room, in the very same filemeans that we are reaching a more elevated state of BIM -- and who doesn't want nirvana? So VW is a partial implementation of BIM, and the reason I must have "total BIM" is that it allows me to design, document, manage and coordinate the building all in one file. The building is a whole, not a kit of parts. There is no redrawing sections, no cleanup: just build the model, add the 2D details where needed, and you are done.
2008-09-26 07:36 PM
2008-09-26 08:15 PM
Mr. wrote:Right... I should have said 'rebuild' not 'redraw'...
PD. You don't have to redraw sections or elevations. They
are linked to the model.
2008-09-26 10:11 PM
2008-09-27 10:41 AM
2008-09-27 04:29 PM
2008-09-27 08:52 PM
metanoia wrote:It's not that way.
What it all comes down to is that if everyone were experts at Revit/ArchiCAD and VW, which app do you think you'd find them on? The kit of parts, or the holistic model-based approach? VW's selling point is that you can retain your existing VW workflow because you don't know how to do BIM, or you can't afford to buy the software and learn how to use a "total BIM" app like AC or Revit.
2008-09-28 03:52 AM
metanoia wrote:I guess you may wish to correct yourself,"that tech university is BCIT?",and according to their website you are not listed as staff ? Also in your web profile
. But when I show a newbie to the world of CAD (I teach at a local technical university), nobody wants to use VW. The wow factor of working on single-file BIM means VW *might* face eventual extinction unless it moves to that model, too. Kids preferTotal BIM...90% of moms agree