Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Schedule

Llian
Advocate
Not sure what I'm missing...the Floor is not showing up in the schedule..can anyone help ? Here are 2 screen shots [ the 2nd one in separate post - how do you post 2 screenshots at the same post ? ]...Thanks.

Picture 1.png
Lilian Seow
LEED AP | cSBA | CAPM | PMP
Interior-Architecture and BIM Management
AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!
2 REPLIES 2
Llian
Advocate
2nd screenshot....
Lilian Seow
LEED AP | cSBA | CAPM | PMP
Interior-Architecture and BIM Management
AC20 USA | 27- macOS 10.14.6| 4 GHz Intel Core i7| 32 GB RAM | Archicad-user since 1994!
Anonymous
Not applicable
What are your scheme settings? In the criteria section you can set which elements the schedule should read.
Maybe it is on a layer which is excluded.