We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Scheduling clerestory windows

Anonymous
Not applicable
Does anybody know if it is possible to use a zone on a lower story (the second floor) to schedule a clerestory window that is hosted by a wall from an upper story (the third floor)?

My goal is to have the info from the lower zone (room name and number) appear in the window schedule for the clerestory windows.

As a work-around, I have copied the second story zone onto the third story, and placed this new zone on a hidden layer so it doesn't show up on the plans. So far this works fine, but it is a bit of a coordination hassle because the project's room names and numbers are fluctuating a bit - Of course the fact that my room numbering is changing isn't really a software issue

In any case, I would love to know if there is a more elegant solution out there!
0 REPLIES 0