Not possible with schedules.
They can only schedule elements placed in the model (plan).
Besides doing it with a schedule, you are only altering the placed instance of the element (object) and not the actual library part defaults.
And besides that, object parameters are not consistent across all objects in the default library.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11