Hello,
Any additional changes in Excel can not be imported into AC because these changes can not be organized within the model
You must :
- create an element nomenclature from AC with one or more properties to inquire
- export the file xls from the menu File / interoperability / classification and properties
- modify only the column or columns previously created by AC
- save the xls file
- import the xls file into AC from the menu File / interoperability / classification and properties
Any additional changes in Excel can not be imported into AC because these changes can not be organized within the model
You must :
- create an element nomenclature from AC with one or more properties to inquire
- export the file xls from the menu File / interoperability / classification and properties
- modify only the column or columns previously created by AC
- save the xls file
- import the xls file into AC from the menu File / interoperability / classification and properties
Christophe - FRANCE
Archicad Designer and Teacher
Archicad 15 to 28 FRA FULL
OS 13 Ventura - MacBook Pro M2 max- 32Go RAM
"Quality is never an accident ; it's always the result of an intelligent effort" John Ruskin
Archicad Designer and Teacher
Archicad 15 to 28 FRA FULL
OS 13 Ventura - MacBook Pro M2 max- 32Go RAM
"Quality is never an accident ; it's always the result of an intelligent effort" John Ruskin
Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2019-06-13 09:01 AM
‎2019-06-13
09:01 AM
Hello,
Thanks for the information.
But I do not need to import back the information, it is maintained as an external database.
Thanks for the information.
But I do not need to import back the information, it is maintained as an external database.

Options
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
‎2019-06-13 09:09 AM
‎2019-06-13
09:09 AM
I think you will need to save as a new Excel file from Archicad.
And then use some Excel magic to merge the new file into the original one.
Barry.
And then use some Excel magic to merge the new file into the original one.
Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11