We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

Zone Schedule Name Sorting

Anonymous
Not applicable
Hello,

Could someone please tell me how I can stop Archicad from sorting the Zone Names incorrectly? I've added numbers to my zone names for graphical clarity and convenience yet the schedule jumps from 1 to 10 then 2 to 20 then proceeds to 3-9.

Thanks.
1 REPLY 1
Barry Kelly
Moderator
The trick is to put a "0" in front of your numbers (names).

01
02
03

or

001
002
003

if you are going to have more than 99 zones.

Technically Archicad is sorting the names correctly in alphabetical order.
It is not recognising the number in your name as a separate number - so does not list them numerically.

Barry.
One of the forum moderators.
Versions 6.5 to 27
i7-10700 @ 2.9Ghz, 32GB ram, GeForce RTX 2060 (6GB), Windows 10
Lenovo Thinkpad - i7-1270P 2.20 GHz, 32GB RAM, Nvidia T550, Windows 11