We value your input!
Please participate in Archicad 28 Home Screen and Tooltips/Quick Tutorials survey

Collaboration with other software
About model and data exchange with 3rd party solutions: Revit, Solibri, dRofus, Bluebeam, structural analysis solutions, and IFC, BCF and DXF/DWG-based exchange, etc.

counting items in a schedule

Ahmed_K
Advisor
Hi mates i'm modelling kind of exhibition stands, using wood manels, i schedueled them using schedueles, and it was so powerfull as always
but there is a problem, i want my schedule to be like shown in the attachement,
using theese addition symbols in the criteria field doesn't help, it gives me that result which i don't want
some propreties formula or something else to achieve this ??
can someone help me please
AMD Ryzen 9 3900X, 32 GB RAM, RTX 3080 10 GB
Archicad 27
Windows 11 professional
https://www.behance.net/Nuance-Architects
0 REPLIES 0