Hey team,

 

I’ve been working on a remodulation project and I’ve added some details with the RENOVATION STATUS. In one of these details, I created an element line LED profile light to show during inspections. I wanted to make it an element because I added PROFILE VALUES and lined the SPECIFICATION NUMBER. I later referred to the SPECIFICATION MANUAL for this.

The issue is that when I add these elements to the details, they don’t show up on the schedule. So, I had to create a separate layer to make them visible on the schedule.

Let me know if you have any questions or suggestions!

Using RENOVATION STATUS there is no overwrite for planned, can not build an overwrite to leave things as is

Hey team,

 

I’m working on a remodeling project using the RENOVATION STATUS. There are three overwrites: EXISTING, DEMOLITION, and NEW CONSTRUCTION. I’ve noticed that when planned, the overwrite is always NEW CONSTRUCTION. I’m planning to create four sets of drawings.

EXISITING

DEMOLISH

NEW CONSTRUCTION

PLANNED: This one is for the building that’s already being completed. I can achieve this by deleting the element in DEMOLISH and changing the NEW CONSTRUCTION to EXISTING.

But I won’t have this set of drawings until I complete this sequence. It would be great if we could create an overwrite for the RENOVATION STATUS, but that’s not possible right now.

0 REPLIES 0