Learn to manage BIM workflows and create professional Archicad templates with the BIM Manager Program.
2007-08-07
09:26 AM
- last edited
3 weeks ago
by
Aruzhan Ilaikova
2007-08-07 07:00 PM
2007-08-08 07:02 PM
2007-08-13 02:10 PM
2007-08-17 04:27 AM
2007-08-17 07:43 AM
andyro wrote:Maybe easier but take more power from the computer. And less power takes more time, and time is money.
On large projects we often copy-paste entire elevations (within the same viewpoint window) - over to the right 300'. That way we have a dumb elevation and a live one. The live one rebuilds.. the dumb one turns into window-legends, etc. Like what Peter says but maybe easier?