2022-06-25 09:40 PM
Please Archicad, make it possible to manually change the order of all added fields in the Project Info. And please make it possible to layout the fields (text font, height, color, bold/italic, etc.)
Our firm uses the project info to add Autotext that appear on multiple drawings. When the text needs to be changed on all drawings we only have to adjust the text in the Project Info. Downside is that you have to search for the right text because the fields can not be ordered.
2022-07-27 09:40 AM
Hello,
Thank you very much for sharing this great idea!
I'm glad to say that this is an existing wish in our Wish list database
(for future reference, you can refer to it as IDEA-1152). Hopefully, our Product Management team will adopt this one in the future.
Have a great day!
Best regards,
Minh
Minh Nguyen
Technical Support Engineer
GRAPHISOFT