2007-09-07 06:50 PM - last edited on 2023-05-26 02:33 AM by Gordana Radonic
2007-10-03 11:44 PM
Juha wrote:I'm not sure why you're seeing this. I've routinely linked one or two views from multiple files (like a single detail from a 12-floor PLP) without that problem.
We have a project with 22 floors. The project leader had made 4 elevation variations to another PLP-file and we tried to link them to the main team project just a few hours before the deadline. What happened?
The ArchiCAD opened background ArchiCADs and started to generate the linked file's floor plans from bottom up even if the facades were not linked/live anymore. No need to say waiting for 4x22 floorplans generating before getting the needed elevations to the layout took hours (too long) and did not meet the deadline even close.
2007-10-04 09:45 AM