2004-10-04 02:16 PM
2004-10-09 08:37 PM
TomWaltz wrote:I don't see why the unlinking and replacement are necessary. You can set the layers of the views in the invalid draft to carry just the data you need (I assume the details are still linked to the source view or this would be no issue at all) then you can delete the old data and merge the new. I'm not sure this is that much less work than the copy/paste approach though.
It seems like the publishing, merging, unlinking, and replacing all the detail markers is still a lot of work.
I've long been pushing for the ability to import details from one file to another, and I think this is the first error-correcting method I have found for it. I always thought of it as a way to re-use data from previous projects.