2019-01-2507:42 PM - last edited on 2023-05-2602:12 PM by Rubia Torres
2019-01-2507:42 PM
Why would the building material "2x wood frame" with a priority of 683 extend over building material "Masonry - structural" with a Priority of 750 in a 3D window but not the 2D? They are on the same layer.
Archicad 22.3006
macOS 10.13.6